LIST OF MAJOR COMPLETED PROJECTS OF PT. ONASIS INDONESIA
No. Title of The Project Scope of Work Client Location Period
1 Mechanical & Fabrication Installation Muntok

- Design and Engineering. Winch material is imported from Singapore
- All Material are fabricated at Jakarta and Mobilized to Muntok Pangkal Pinang - Sumatera.
- Install at FSO.Laksmiati and testing

PT. MEDCO E & P INDONESIA Muntok, Pangkal Pinang Sumatera Sept 2004 - Oct 2004
2 Tank Cleaning

- Dirty oil from cude oil Storage tanks ( 9 tank) at Tengguleng terminal being pumped to clean tanks. All tanks are Gas freeing. Sludges are cleaned and demuked to transport to PPLI - at Cilengsi West Java. 

PT. MEDCO E & P INDONESIA Tengguleng Terminal, South Sumatera Sept 2004 - Oct 2004
3 Charter-Hire of Mooring Vessel

-Operating crewboat  at Tengguleng Terminal

PT. MEDCO E & P INDONESIA Tengguleng Terminal, South Sumatera July 2005 - July 200
4 Supply Subsea Ball Valve & Main Bearing

- Procurement (Supply Material)

JOB PERTAMINA -PETROCHINA EAST JAVA Jakarta Aug 2005 - Nov 2005
5 Supply Transformer

- Procurement (Supply Material)

PT. SWARI ANDINI Jakarta Jan 2006 - March 200
6 Mechanical, Fabrication, Pipeline Installation (Offshore services) for FSO Cinta Natomas

- Fabricate & Install PLEM
- Piling 14\" PLEM pile
- 10\" subsea pipe line Installation (2000 m)
- Piling 48\" Mooring pile
- Connect 4\" mooring chain to mooring pile (6 x 250 meters)
- Lay down 4\" mooring chain (6 x 259 meters)
- Wrapping weld joint
- Holiday Test
- Tie-in 10\" S pipe
- Pigging & Hydrostatic Test
- Install SPM 1179
- Assembly 2 string of subsea hoses (10\" x 30ft x 5 length)
- Connect  2 string of subsea hose to PLEM and SPM
- Assembly 2 string of floating hose (10\" x 35ft x 13 length)
- Connect  2 string of floating hose to SPM and FSO CINTANATOMAS
- Charter-Hire of Crane Barge and Ships Support (Mei - September 2006)
- Purcase Order 10\" class #900 sub sea ball valve for PLEM

SPM#4 Overhaul (SPM 1179) :
- Renew swivel bearing
- Aligment swivel bearing
- Renew Main Roller Bearing (MRB)
- Aligment Main Roller Bearing
- Change piping on turntable from 16\" to 10\"
- Change piping on central chamber from 16\" to 10\"
- Renew ball valve 10\" class 150 on center chamber and turntable
- Renew butterfly valve on turntable
- Disconnect all length subsea hose & place on ship deck
- Disconnect 6 of 3,5\" SPM mooring chain and give marker boy
  on the center of SPM. All end of mooring chain connect to marker buoy
  with wire sling

Mooring Chain Recocery ex. SPM#8 :
- Site scan survey, for identification mooring chain position before lift up.
- Cutting 6 length x 4\" mooring chain on sea bed (1 length of mooring chain
   ± 250 meters)
- lift up  6 length x 4\" mooring chain and place on work barge deck.

Pipeline Extension :
- Install pipeline Ø 10\", 2000 m from Niria Station to
   Cinta Natomas Marine Terminal

SPM, Subsea Hose and Chain Removal ex FSO MT. NIRIA :
- Disconnect floating hose
- Disconnect Subsea hose & place on barge deck
- Disconnect 6 mooring chain and lay down on sea bed
- Disconnect parts of subsea hose string and place on barge deck.

JOB PERTAMINA -PETROCHINA EAST JAVA Tuban, East Java Dec 2005 - Sept 2006
7 Dry Docking SPM-1079 and Chain Recovery & Maintenance

- Lift up 6 4.5 inch length of mooring chain and cutting on sea bed then
  place on barge deck.
- Clean up 6 length of mooring chain from sand and marine growth.
- Sandblasting and Painting
- Renew Rubber Fender
- Repair Lifting Davit on turntable
- Install new reducer from 12\" to 6\" under buoy body
- Renew Anode
- Renew plate of ballast tank

Camar Resources Canada, Inc (CRC) Tuban, East Java Sept 2006 - Dec 2006
8 Deck Replating SPM#1146

- Replating main  deck of buoy (80%)
- Sandblasting & Painting
- Renew anode
- Replace foam
- Turning test

CNOOC SES Ltd. Jakarta Jan 2007 - April 200
9 Provision of Installation SubMarine and Flexible Hoses

- Engineering and Procedures
- Mooring Analysis & Design
- Procurement & Fabrication of Installation aids,
  Flexible Hose Mooring Sinker and Floater.
- Crane Barge Mobilization and Demobilization
- Floating Hose and Submarine Hose Installation
- Platform Annual Inspection

SANTOS (SAMPANG) Pty. Ltd Santos Oyong Field, Sampang (Madura) July 2007 - Feb. 200
10 Construction Services CITIC SERAM ENERGY LIMITED

- Modifiy piping and instrument systems as part
of upgrade of GVF and ISF equipment.
- Install new skim pond and oil skimming
 system
- Prepare foundations and tie-ins for Nitrogen
Generator
- Relocate electrical panels to a location outside
the Hazardous Area Classification, and upgrade
Jetty Crane motor and panels to the required
classification. A covered  building is required to house the 2 electrical panels.
- Modify 20\" piping and prepare foundations at loading facility to accept installation of metering skid.install in electrical and instrumentation and assist in commission unit.
- Install new vapor recovery facilities at MPF. Includes 1MM 60psig compressor, collection and distribution networks,and gas condition package
- Install H2S stripper (25,000 bbl/day, column & air fan type) with associated pumps, piping, electrical supply and foundations at MPF.
- Install 350m of 8\" piping, Flare stack, LLP header, KO Drum and associated foundations.
- 14 km telecommunication / Fiber Optic cable between Wellsite, FF, MPF and MEF, communications equipment at control room and operation/ loading bases. Interface hardware between MEF system and MPF DCS / F&G system, control cable. Etc.
- Phase 2 - Camp upgrades/modifications
- Phase 2 - Buildings/Warehouse upgrades
- Re-rating 20\" HSFO Loading Lone
- Replace original / existing refrigeration / chiller skid with new one to provide back up to the new system
- Piping, Mechanical, electrical & Instrumentation installation and commissioning.
- Construction / installation of 17 Kms pipeline from Nief to MPF

CITIC SERAM ENERGY LIMITED Kab. Seram Bag Timur, Bula, Seram Island Nov. 2007 - Oct 2009
11 Rental of Accomodation and Work Barge Onasis-1

- Support HDD (Horizontal Directional Drilling) operation

PT. MERLASAKTI ABADI Services Kodeco Energy Co.Ltd Area in Gresik Feb. 2008 - Jul. 200
12 Construction Services For BSP Area 2008-2010

- MRS (Modifications Request Sheet)
- Repair of Leaking Lines
- Repair of Structural Member
- Site Preparation for Drilling Operation (Temporary Burner)
- Fabrication and Installation of Conductor Pile
- Fabrication and Installation of Small Modifications
- Assistance During Plant Shut Down
- Assistance for Vessel Inspection
- Painting WORKS
- Engineering
- Rental Crawler Crane 50 ton
- Preparing Work Procedure and HAZID

TOTAL E & P INDONESIE Bekapai, Senipah Peciko, East Kalimantan Mar. 2008 - March 20
13 Construction and Maintenance Services at CPU and TATUN Area 2008-2009

- MRS (Modifications Request Sheet)
- Repair of Leaking Lines
- Repair of Structural Member
- Mechanical Works
- Site Preparation for Drilling Operation (Temporary Platform, Escape rote, Etc)
- Fabrication and Installation of Conductor Pile
- Fabrication and Installation of Small Modifications
- Assistance During Plant Shut Down
- Assistance for Vessel Inspection
- Painting WORKS
- Engineering
- Provision of Supply Materials
- Rental Crawler Crane 50 ton
- Preparing Work Procedure and HAZID

TOTAL E & P INDONESIE Tambora, East Kalimantan June 2008 - Jan 2010
14 Provision of Barge Onasis-1

- Provision of Barge Onasis-1 to support HDD (Horizontal Directional
   Drilling) operation

KODECO ENERGY CO., LTD Gresik area, East Java Aug 2008
15 Provision of Accommodation & Work Barge Complete with AHT

Provision of Work & Accommodation Barge Complete with AHT
Provision of Construction Barge with AHT

SANTOS (SAMPANG) Pty. Ltd Madura strait, East Java Sep. 2008 - Oct 2009
16 Scaffolding Works At BSP

Provide Scaffolding paltform and its related works including erection
and dismantling to support the maintenance works

TOTAL E & P INDONESIE Bekapai, Senipah Peciko, East Kalimantan Oct 2009 - Dec 2009
17 Construction Maintenance Services At Company SPU & SISI NUBI FIELD

- MRS (Modifications Request Sheet)
- Repair of Leaking Lines
- Repair of Structural Member
- Site Preparation for Drilling Operation (Temporary Burner)
- Fabrication and Installation of Conductor Pile
- Fabrication and Installation of Small Modifications
- Assistance During Plant Shut Down
- Assistance for Vessel Inspection
- Mechanical works
- Painting WORKS
- Engineering
- Rental Crawler Crane 50 ton
- Preparing Work Procedure and HAZID
- Provision of Supply Materials

TOTAL E & P INDONESIE South Processor Unit & SISI NUBI FIELD Nop 2009 - Oct. 2010
18 Rental Heavy Equipment

Rental Heavy Equipment :
- Crane Capacity 70 Ton
- Forklif 3 Ton
- Crane Mounted Truck
- Air Compressor

CITIC SERAM ENERGY LIMITED Kab. Seram Bag Timur, Bula, Seram Island Nov. 2009 - Mar 2011
19 Construction and Maintenance Services at CPU and TATUN Area 2010

- MRS (Modifications Request Sheet)
- Repair of Leaking Lines
- Repair of Structural Member
- Mechanical Works
- Site Preparation for Drilling Operation (Temporary Platform, Escape rote, Etc)
- Fabrication and Installation of Conductor Pile
- Fabrication and Installation of Small Modifications
- Assistance During Plant Shut Down
- Assistance for Vessel Inspection
- Painting WORKS
- Engineering
- Provision of Supply Materials
- Rental Crawler Crane 50 ton
- Preparing Work Procedure and HAZID
 

TOTAL E & P INDONESIE Tambora, East Kalimantan Feb. 2010 - Dec 2011
20 Tatun Well Connection (Mechanical) Package #-3B
  • Performed on the three types of wells, typical adjacent,  typical 3rd CP and typical last spool Installation.
  • Planning, detailed engineering, Procurement, Yard Fabrication, Coating as per specified, transportation, Site Installation, Inspection.
  • Pre-commissioning and Commissioning of the new Installation (plant)
TOTAL E & P INDONESIE Tambora & Tunu Field East Kalimantan Mar. 2011 - Oct 2011
LIST OF ONGOING PROJECTS OF PT. ONASIS INDONESIA
No. Title of The Project Scope of Work Client Location Period
1 Provision of Construction Accommodation Barge
  • Provide fully manned and operable vessel
  • Provide All Marine operation Management
CHEVRON Indonesia Balikpapan, East Kalimantan July 2010-july 2012
2 Construction and Maintenance Services at SPU and Sisi Nubi Field 2010
  • MRS (Modification Request Sheet)
  • Repair of leaking Lines
  • Repair of Structural Member
  • Site Preparation for Drilling Operation
  • Fabrication and Installation of Conductor Pile
  • Fabrication and Installation of small Modifications
  • Assistance for Vessel Inspection
  • Painting Works
  • Engineering 
  • Prepare work procedure and HAZAD
  • Provision of Supply Material
TOTAL E & P INDONESIE SPU Field, East Kalimantan Dec 2010 - Dec 2012
3 Construction and Maintenance Services for North Area (CPU, TRF, TMB, SNB and Tunu South)
  • MRS (Modification Request Sheet)
  • Repair of Leaking Lines
  • Repair of Structural Member
  • Site Preparation for Drilling Operation 
  • Fabrication and Installation of Small Modifications
  • Assistance for Vessel Inspection
  • Painting Works
  • Engineering
  • Preparing Work Procedure and HAZID
TOTAL E & P INDONESIE East Kalimantan Apr 2011 - Apr 2012
4 Tatun Well Connection (Mechanical) Package-4A

The work shall performed on the three types of wells, typical adjacent, typical 3rd CP and typical last spool installation in Company's Tambora and Tunu Fields. The Installation shall require planning, detail engineering, procurement of materials which are not supplied by Company, yard fabrication, coating as specified, transportation, site installation, inspection, and pre-commissioning and commissioning of the new installation (plant).

TOTAL E & P INDONESIE Delta Mahakam East Kalimantan Dec.2011 - May 2012
5 Construction and Maintenance Services at SPU and Sisi Nubi Field 2012 - 2014



TOTAL E & P INDONESIE SPU & Sisi Nubi Field 2012 - 2014